Frame almost ready

Today I got the frame sanded down and primed on both sides.

2015-09-15 14.30.27

I primed the rear crossmember.

2015-09-15 14.30.43

And the bottom of the tub.

2015-09-15 14.30.15

Lastly, I permanently bolted (had to cut about 3/8″ off the carriage bolts) and welded the rear crossmember to the frame and touched up the primer.

2015-09-15 16.20.31

So hopefully tomorrow I can get a couple of coats of OD on the bottom of the tub and frame. If it dries fast enough I’ll fit them together and stitch weld them together. I also need to extend the front angle up by about 1/4″ so that it is the same height as the seam of the patch panel. That way I wont have to do any metal finishing on that seam (on the outside anyway).

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s